Us Official Photographs
ME-109 factory damaged
1943-08-13
craft assembly shops; (3) direct hits on storehouses; (4) two sheds destroyed and hangar damaged; (5) hangar destroyed by fire; (6) tarmac outside large hangar destroyed by direct hit; (7) R.R. damaged, but repaired and active; (8) labor camps damaged. Henschel Factory (9) storehouse damaged; (10) workshops severely damaged. Steyr-Daimler-Puch Factory: (11) hit in open damaged two sheds; (12) direct hits on machine and assembly shops; (13) power station shows signs of blast; (14) workshop roof hole 4,200 feet square. Unnumbered annotations indicate less vital damage. The date of the mission was 13 August 1943. Phot. News Bk FEB 26 1944 (1)